October
2009
South
Yorkshire Digital Region
SCD has joined the delivery team building this high profile
telecommunications project throughout Sheffield, Doncaster,
Rotherham and Barnsley.
SCD will be installing over 1,200Km of blown fibre ducting
then blowing and terminating more than 6,000Km of optical
fibre cable.
This project is the largest of its type in Europe. It
wiill deliver very high speed Next Generation Broadband
to businesses and households across South Yorkshire. |
| |
|
 |
October
2009
East
Riding of Yorkshire Council
SCD has won a prestigious micro-trenching contract within
the East Riding of Yorkshire.
SCD will be working with
the Council to install optical fibre cable in specialist
trenches between schools and council offices..
This high speed optical
fibre communications will enable rural primary schools to benefit from the same speeds of internet access as
their urban counterparts. |
|
|
| |
|
 |
| |
|
Ducting,
chambers and optical fibre infrastructure
Canterbury Christ Church University
is expanding its campus facilities to the south of Canterbury
city centre with the new Augustine House development
It is also acquiring
buildings previously used by Canterbury College.
A highly resilient computer network infrastructure
that joins all these locations together at very high
speed had to be installed.
SCD was commissioned to install more than
2Km of new telecommunications grade ducting between
all the locations. This work is through a very archeaologically
sensitve area.
After installing the ducting, new singlemode
optical fibre cable is to be installed, terminated and
tested to the Universities strict criteria.
SCD led the negotiations with Kent County
Council, Canterbury City Council, Canterbuty College,
University of Creative Arts and Canterbury Archeaological
Trust to enure the civil engineering was delivered in
time for Augustine House to open on 1st August 2009.
The primary optical fibre link was commissioned
on 30th July 2009. The resilient fibres will be handed
over once Rutland House, one of the new acquisitions,
has completed its renovation.
|
 |
|
 |
Civil
engineering services to expand the CCTV infrastructure
In 2008 SCD was contracted by Calderdale Council
to provide a new utility infrastructure for its new
and totally bespoke Security Control Suite.
This included the installation and commissioning of
sewers, potable water, LV electric and telecommunications
services.
Since that time SCD has worked with the
council to expand the CCTV presence throughout Calderdale.
SCD works with the Council's security
contractor in providing civil engineering services which
include:
- Concrete formworks to cast camera column bases
with integral ducting
- Camera column erecting and mounting
- Cable ducting
- Install CCTV cameras at height
SCD's specialist services enable the Council
and its security contractor to expand their capability
quickly and cost effectively. |
 |
|
 |
Ground
works in Wakefield's premier regeneration scheme.
Wakefield city centre is undergoing a number
of regeneration schemes.
In
Westgate, adjacent to the railway station, is a £140m
mixed use development known as Merchant Gate.
Covering 17 acres of brownfield site the
citizens of wakefield will benefit from a new business
quarter, multi-story car park, shops, cafes, residences
and an open public space.
SCD's £1.2m contract is to install kerbing,
footways, tactile paving and hard landscaping.
|
 |
|
 |
Ducting,
chambers, electrical and optical fibre cabling services
aql is one of the UKs fastest growing telecommunications
companies offering . corporate mobile, telephony, messaging
and internet services.
To
support their ongoing expansion, aql has contracted
SCD to install multiple gigabit connectivity via diverse
routes into separate buildings within Leeds city centre.
In addition, the buildings are linked
by dark fibre and a private power network, which, when
complete will ensure both leeds Points of Presence are
N+3 for power (this means two separate generators and
two separate power Leeds). |
 |
|
|
|
|